Schedule and location
The wind farm has been completed.
2022
Installation of turbines
2023
Wind farm in operation
Wind farm has been handed to the owner
Contact
![](https://winda.fi/wp-content/uploads/2023/11/robert-doucha.webp)
Robert Doucha
Chairman of the Board
robert.doucha@winda.fi