Completed

Haapalamminkangas – Saarijärvi

Wind power |
Winda Energy has managed the construction works of 28,5MW wind farm in Haapalamminkangas, Saarijärvi. The wind farm is owned by BlackRock Real Assets and has five Nordex N163-5.7 turbines, which has been installed late 2022. Before turbine installations, Keski-Suomen Betonirakenne has conducted C-BoP works in the area in early 2022. The wind farm has been completed in the summer 2023.
5
turbines
28,5 MW
total power
2023
completion

Schedule and location

The wind farm has been completed.

2022

Installation of turbines

2023

Wind farm in operation

Wind farm has been handed to the owner