Development phase

Pyhäjärvi – Pyhäjärvi

Wind power | Pyhäjärvi
Winda Energy is planning a wind farm in Pyhäjärvi. The project area is approximately 770 hectares and is located about 15 km southeast of Pyhäjärvi’s center. The initial plan includes 11 wind turbines. The number and placement of the turbines will be refined through discussions with landowners and the zoning process. In addition to zoning, an Environmental Impact Assessment (EIA) will be conducted for the area.
11
turbines
77 MW
total power
790
hectare

Schedule and location

2022

EIA Program

2023

EIA Report
Reasoned conclusion

2025

OAS
Master plan draft
Master plan proposal

2026

Process for master plan approval
Building permits
Start of construction