Kummunmaa ja Repojänkkä – Ylitornio

Wind power |
Winda Energy is planning a wind farm in the Kummunmaa and Repojänkkä area in Ylitornio. The project area is approximately 1820 hectares. The initial plan includes 18-22 wind turbines. The number and placement of the turbines will be refined through discussions with landowners and the zoning process. In addition to zoning, an Environmental Impact Assessment (EIA) will be conducted for the area.
18-22
turbines
154 MW
total power
1875
hectare

Schedule and location

2025

EIA Program
OAS

2026

EIA Report
Master plan draft

2027

Master plan proposal

2028

Building permits
Start of construction